



The walls have been floated and taped, stomped, dragged and orange peeled, and the trim work is going up. Next, the cabinets, paint, lights, hardware, and finally the floors. We'll see how long it takes...the goal is Christmas!
The first picture is the back door, the second the bay window dining area, the third is the view into the bedroom from the kitchen (you can see the door to the heating unit, the closet opening, and the window). The last picture shows the ceiling in the living room.




No comments:
Post a Comment